No Injury Crashes on US 36 in 2016
No injury crashes in 2016 on US 36’s diverging diamond interchange (DDI). Kudos to the Town of Superior. A great project and tool for saving citizens millions of dollars while also increasing safety.
Ever go 100 mph in the wrong direction?
Ever go 100 mph in the wrong direction? This can be a problem among roadway improvement projects. Sometimes the jurisdiction maintaining the roadway will receive complaints about an intersection and in an effort to provide good customer service will quickly make decisions based upon: the complaints, aerial photos, intersection observations, and meetings. Then they quickly jump into “fix it” mode. Sometimes this approach works well. However, sometimes they discover that a lot of time and resources were spent only to find it would have been better to go a different direction.
It can be challenging to predict the outcome without having good data. What worked well for one intersection in the past may not be the best solution for another intersection; even if they have similar characteristics. For example, Kellar Engineering (KE) is currently designing one project near a large high school in Colorado where a multi-lane roundabout was the best intersection option. KE is also designing a project at another large high school in Colorado where a signalized intersection was best. What was best for one intersection near a high school was not best for another intersection near a high school.
Therefore In order to determine the best roadway improvement for your situation, KE is offering feasibility study services. In a feasibility study, KE will: set up data collection cameras; obtain 24-hour video counts; obtain real data for all modes of transportation (vehicles, bicycles, & pedestrians); review crash data; and then analyze the data by creating traffic models. The feasibility study is useful because it: is inexpensive, compares intersection improvement options, and gives the client the tools to make decisions based upon good data before moving forward.
To find out if a feasibility study would be appropriate for your project, please feel free to contact Kellar Engineering at: (970) 219-1602 or skellar@kellarengineering.com for a free consultation.
Access Management
I have spent years working on access management on behalf of public municipalities, cities, counties, Department of Transportations, and private clients. Having spent time reviewing traffic impact studies and access points for both the public sector and private sector I have realized that more often than people realize, both parties have similar goals when it comes to access management. Both the local jurisdictions and the developers often want a safe and efficient roadway with properly spaced access points. Many jurisdictions have discovered that it is prudent to not take a “one size fits all” approach for access management but to leave room for engineering judgment for the following reasons:
-
When developing large properties, it is often appropriate to have more than one access point as long as proper access spacing can be achieved and the proposed access points can supported in a Traffic Impact Study (TIS) or an Access Management Plan.
-
Having more than one access point can sometimes help traffic. Appropriately spaced access points spread out turning movements onto the public roadway which helps prevent the situation where one access point can cause intersection levels of service (LOS) to degrade over time. A TIS will be able to analyze the situation of whether an additional access point would be beneficial.
-
Having at least two points of access is often a fire department requirement in case one of the access points is obstructed.
-
Having more than one access point also allows for access to the property if there is construction activity on the public street that impacts one of the access points.
Please note that I am not recommending that more than one access point be allowed for all situations. For smaller parcels that cannot achieve proper access spacing many times one access point is appropriate. However, I would encourage all parties to not try to apply a “one size fits all” scenario to access management and leave room for engineering judgment on a case-by-case basis. After all, some of the best redevelopment corridors in the U.S. resulted from a redevelopment plan and Access Management Plan.
The following aerial photo is an example of what I consider to be good access management coordination on a project where the development and the municipality had positive results on balancing the needs of the community and the needs of the development.
Kellar Engineering Update
Are you using your traffic signal equipment to it’s fullest capabilities? Find out how to add signal capacity without adding cost. Free 30 min. phone consult. www.kellarengineering.com
Current Project in Colorado
Traffic Impact Study in Northern Colorado: Current project in Colorado. Increasing the developed value of the property by providing great access. www.kellarengineering.com
Roundabout vs. Traffic Signal?